“Some lights are not working” gives a remote support team very little to investigate. A marked facade photograph, the affected fixture IDs and a short record of when the fault appears provide a more useful starting point. They help the next person ask a specific question instead of requesting the same missing information again.
A useful facade lighting fault report separates observations from suspected causes. It connects each photograph or measurement to a location and operating condition. The aim is to support a controlled diagnosis, not to prove a component has failed before anyone has checked it. This approach works for contractors, distributors and maintenance teams communicating across different sites and time zones.
Describe what happens before naming the cause
Write what the observer can actually confirm: the entire zone remains off, one colour is absent, several fixtures behave intermittently, or the fault appears only in a particular scene. State when it was first noticed, how often it occurs and whether it is present now. “The driver is faulty” is a diagnosis; “the fixture turns off after the evening scene starts” is an observation.
Describe the expected behaviour as well. Identify the intended scene, timing and reference area, and say whether the installation previously operated correctly in that condition. A colour change might be a programmed event rather than a fault. Include the relevant scene reference or screenshot without assuming that the support engineer knows the project’s naming conventions.
Keep uncertainty visible. If the exact start time is unknown, say when the problem was discovered. If the team has not checked all fixtures, report the inspected quantity and the uninspected area separately. This prevents an incomplete observation from becoming an apparently precise statement about the whole facade.

Describe what happens before naming the cause
Identify the units and affected zones
Provide the order or project reference, exact model, available serial or batch identifiers and installation location. Keep label photographs readable in the original files. If a distributor or private-label brand uses a different model number, include the known cross-reference. General technical-support guidance from ETC similarly asks callers to have equipment identification available.
Mark affected units on an elevation, annotated site photograph or simple zone drawing. Show nearby units that appear normal. Where verified records exist, identify the power branch and control segment serving the area. A physical row of lights is not necessarily one electrical circuit or one data chain, so avoid drawing connections that have not been confirmed.
A practical report might say “east entrance, units E03 to E05, observed during scene S2,” with the same labels used on its photographs. Those are hypothetical identifiers. Their purpose is to let a remote engineer find the same place on every attachment and avoid confusing it with another entrance photographed from the opposite direction.

Identify the units and affected zones
Capture evidence with operating context
Start with a wide view showing the affected area, then take closer views of the relevant fixtures and accessible labels. Keep a consistent location reference between views. For an intermittent symptom, record a short video that includes the command or scene change when possible. Retain the original files rather than sending only compressed screenshots with cropped context.
Note the time, active scene, dimming setting and relevant weather or recent events. Photograph the controller status without changing settings merely to make the screen easier to capture. A phone video can show an intermittent pattern, but camera exposure and scanning can also affect its appearance. It cannot independently establish an electrical flicker frequency or the cause of a control fault.
Collect evidence only from a safe position. Do not open energised enclosures, disconnect live equipment or climb onto facade structures for a better photograph. Electrical checks and work at height belong with qualified personnel following the site procedure. If safe access is unavailable, identify the missing evidence and let the support team plan the next step.

Capture evidence with operating context
Keep a log of changes and completed checks
Record recent maintenance, replacement parts, controller updates, addressing changes and alterations to the operating schedule. Establish the order of events without assuming that the most recent event caused the fault. Note what happened before and after each authorised check. Repeatedly changing several settings together can make the original symptom harder to reproduce.
When qualified site personnel provide measurements, include the measurement point, units, operating condition and instrument information needed to interpret them. A voltage value without a location or load condition is easy to misunderstand. Keep raw observations separate from conclusions, and state any uncertainty about the circuit identification or test setup.
Use detailed fault-specific instructions only after the relevant system has been identified. The existing LNJAMI articles on 24 V voltage drop and DMX addressing address different diagnostic questions. The report should supply the context needed to choose the appropriate investigation.

Keep a log of changes and completed checks
Build a report another team can follow
Use one report reference for the case and a dated attachment list. Give files meaningful names such as E03-label, east-elevation and S2-observation, then explain those names in the report. Keep site contacts and agreed communication channels together. Do not include passwords or remote-access credentials in ordinary report attachments.
For a hypothetical report, the team has checked eight fixtures, observed an intermittent issue on two and has not inspected the upper level. The scene reference is known, but the branch assignment is unverified. That limited account is more useful than claiming the entire building has a power problem. It tells support what is established and what still needs checking.
The table below is a starting structure for a lighting fault report. Use the manufacturer’s own service form when one is required, and add project-specific fields. A complete report supports diagnosis; it does not itself establish warranty coverage or authorise replacement of equipment.
| Record | What to include |
|---|---|
| Identity | Project/order, model, serial or batch reference |
| Location and scope | Fixture IDs, affected area, normal neighbours, uninspected units |
| Observed behaviour | Expected result, actual symptom, timing and active scene |
| Evidence | Original photos/video, marked plan, authorised measurements |
| Change log | Recent changes, checks, results and outstanding unknowns |
| Next action | Responsible person, agreed check and review date |

Build a report another team can follow
Close the case with a repeatable check
After the agreed action, verify the relevant scene and conditions again. Record who checked the result, when it was checked and which units were included. If the symptom was intermittent, a brief successful power-on may not answer the original question. Agree a suitable observation period and escalation route with the responsible technical team.
Update the case with confirmed findings, completed actions and any remaining limitations. If parts or settings changed, update the relevant project records so the next technician does not work from the old configuration. Keep the original report and evidence alongside the closure record; they explain what the follow-up check was meant to verify.
For LNJAMI equipment, contact the established project or service channel with the report reference and relevant order information. For mixed-brand installations, identify the responsible parties for fixtures, drivers and controls. Clear ownership helps the teams coordinate without treating an unverified symptom as proof against a particular component supplier.

Close the case with a repeatable check
Questions buyers ask
Can photographs identify the failed component?
They can show location and visible condition, but many electrical and control faults need additional checks. Treat photographs as evidence for diagnosis, not a complete diagnosis.
Should the site reset the controller first?
Preserve the current state and logs when safe. Follow the agreed technical procedure before changing settings; a reset can remove useful context or alter the symptom.
What if a fixture label cannot be reached?
Use the project schedule and safe location photographs, state that the identity is unverified, and arrange safe access through the responsible site team if needed.
Discuss the project with LNJAMI
Send the relevant fixture schedule, drawings and project requirements to LNJAMI. Our team can discuss the product information needed for your outdoor lighting project.
Discuss your project
LNJAMI · Outdoor architectural LED lighting · Customisation